The new distribution center was 241,000 square feet of refrigerated storage space and 40,000 square feet of office space. MTX was awarded the design and construction of twenty (20) banana ripening rooms through a competitive tendering process. The project was successfully completed in twenty-one (21) weeks of construction on site in Laval.
Project Details:
Loblaws awarded MTX with the contract to update the ripening rooms at their Boucherville Quebec…
Winfresh UK required extra capacity at their Stanstead location, in order to cater for their…
Van-Whole produce awarded MTX the contract to demolish their existing ten (10) 20-pallet ripening rooms…
Installation of two, 3-tier random access tropical ripening rooms and a 3-tier blast chiller for…
Save On Foods constructed a distribution facility in Acheson, Alberta. The facility was built by…
MTX Contracts Ltd successfully completed the design, construction, engineering and commissioning of a new temperature…