Loblaws – 12 x 42 Pallet Banana Ripening Rooms
Loblaws awarded MTX with the contract to update the ripening rooms at their Boucherville Quebec distribution centre.
Loblaws awarded MTX with the contract to update the ripening rooms at their Boucherville Quebec distribution centre.
Winfresh UK required extra capacity at their Stanstead location, in order to cater for their continued growth.
Van-Whole produce awarded MTX the contract to demolish their existing ten (10) 20-pallet ripening rooms and replace them with 15-21 pallet ripening rooms and 1-14 pallet ripening room.
Installation of two, 3-tier random access tropical ripening rooms and a 3-tier blast chiller for
Turners PPL at their ripening facility in Soham, Cambridgeshire.
Save On Foods constructed a distribution facility in Acheson, Alberta. The facility was built by Norson Construction and consisted of 562,000 square feet of ambient and refrigerated warehouse space and offices.
MTX Contracts Ltd successfully completed the design, construction, engineering and commissioning of a new temperature controlled distribution facility including the creation of 2100m² of state of the art contemporary office accommodation and welfare facilities at a 13,800 m² (<150,000sq ft) warehouse in Birmingham.
Metro constructed a new fruit, vegetable, and dairy distribution center in Laval, Quebec.
MTX completed the construction of 14no 54 pallet three tier banana pressurized ripening rooms. The rooms were installed and commissioned alongside a fully operational depot at Fyffes Basingstoke.
MTX completed a project to strip out and replace the existing chiller plant for Univeg Katope UK in Spalding.
MTX Contracts Ltd were approached to assist in looking at ways of improving their existing ripening infrastructure.