MTX completed a project to strip out and replace the existing chiller plant for Univeg Katope UK in Spalding.

The extent of the contract included new: Chiller Unit, Buffer Vessel, Variable speed pump set, associated controls and modification of main water pipe work runs.

The key aim for the project was to undertake the works as quickly as possible with minimal disruptions due to the site being fully operation and with no opportunity to shut down.

This was done by strategic planning of the strip out and removal phase, new plant installation phase and pre-fabricated pipe work to minimise install time.

The plant was up and running again within 48 hrs with the project being fully complete within 5 days.