This facility allows Fyffes to ripen an additional 756 tonnes of bananas per cycle. Coupled with the existing single and two tier rooms, the full site capacity has been increased to a total of 2148 tonnes per cycle.
ambient conditions, the greater advantage of free-cooling, subsequently reducing the load on the chillers’ compressors. Other energy management systems that have been installed on this project are a chiller sequence control system, refrigeration saving modules and fan inverter drives. These all contribute to the efficient operation of our ripening system, resulting in reduced energy consumption.
The entire design, installation and commissioning, including the mechanical and electrical was managed in house with the project handed over on time and within budget.
Loblaws awarded MTX with the contract to update the ripening rooms at their Boucherville Quebec…
Winfresh UK required extra capacity at their Stanstead location, in order to cater for their…
Van-Whole produce awarded MTX the contract to demolish their existing ten (10) 20-pallet ripening rooms…
Installation of two, 3-tier random access tropical ripening rooms and a 3-tier blast chiller for…
Save On Foods constructed a distribution facility in Acheson, Alberta. The facility was built by…
MTX Contracts Ltd successfully completed the design, construction, engineering and commissioning of a new temperature…