The new 42 pallet ripening rooms were designed to work with the existing direct expansion refrigeration rack on site that fed the previous generation of ripening rooms. The project was completed over 3 months, allowing for minimal interruption to the facility’s day to day activities. The project was carried out with local RBQ trades and delivered to the client on schedule.
Project Details:
Winfresh UK required extra capacity at their Stanstead location, in order to cater for their…
Van-Whole produce awarded MTX the contract to demolish their existing ten (10) 20-pallet ripening rooms…
Installation of two, 3-tier random access tropical ripening rooms and a 3-tier blast chiller for…
Save On Foods constructed a distribution facility in Acheson, Alberta. The facility was built by…
MTX Contracts Ltd successfully completed the design, construction, engineering and commissioning of a new temperature…
Metro constructed a new fruit, vegetable, and dairy distribution center in Laval, Quebec.