MTX was contracted to design and build five (5) forty-two pallet banana ripening rooms. The ripening rooms were cooled with a secondary glycol system which received primary cooling via the buildings ammonia refrigeration system. The project featured over the top running doors which ensured aisle lighting was uninterrupted and doors were more easily serviced from the ceiling of the rooms. All rooms were network with remote access and monitoring by facility maintenance and operators.
Project Details:
Loblaws awarded MTX with the contract to update the ripening rooms at their Boucherville Quebec…
Winfresh UK required extra capacity at their Stanstead location, in order to cater for their…
Van-Whole produce awarded MTX the contract to demolish their existing ten (10) 20-pallet ripening rooms…
Installation of two, 3-tier random access tropical ripening rooms and a 3-tier blast chiller for…
MTX Contracts Ltd successfully completed the design, construction, engineering and commissioning of a new temperature…
Metro constructed a new fruit, vegetable, and dairy distribution center in Laval, Quebec.