Winfresh UK Ltd – Chilled Water Plant Upgrade

In recent years MTX has installed a number of additional facilities on this site including energy saving systems which have already resulted in savings of 100’s of thousands of pounds in electricity with payback periods of less than 12 months.

Winfresh approached MTX requesting an appraisal of their existing chiller plant and associated chilled water distribution system which resulted in proposals to replace 2 existing chillers and water circulation pumps.

The 2 new chillers, manufactured by Airedale of Leeds, are energy efficient free cooling chillers which use ambient air for partial or full cooling in conjunction with the refrigeration compressors as required. A sequence controller maintains a constant supply water temperature to ensure that the free cooling function of the new and existing free cooling chiller is maximised whilst still meeting cooling demand from the process.

The existing secondary water system has also been upgraded to provide energy saving inverter driven pumps to supply chilled water as required to the process.

This installation has been a huge success proving that inefficient facilities can be re-developed to become energy efficient providing the site with a new lease of life without the need for large scale replacement.

MTX Ripening Technology

Recent Posts

Loblaws – 12 x 42 Pallet Banana Ripening Rooms

Loblaws awarded MTX with the contract to update the ripening rooms at their Boucherville Quebec…

4 years ago

Winfresh UK – Ripening Rooms

Winfresh UK required extra capacity at their Stanstead location, in order to cater for their…

4 years ago

Van-Whole Produce – Banana Ripening Rooms

Van-Whole produce awarded MTX the contract to demolish their existing ten (10) 20-pallet ripening rooms…

4 years ago

Turner’s PPL – Tropical Ripening Rooms

Installation of two, 3-tier random access tropical ripening rooms and a 3-tier blast chiller for…

4 years ago

Save On Foods – 5 x 42 Pallet Banana Ripening Rooms

Save On Foods constructed a distribution facility in Acheson, Alberta. The facility was built by…

4 years ago

Minor Weir and Willis Temperature Controlled Distribution Warehouse

MTX Contracts Ltd successfully completed the design, construction, engineering and commissioning of a new temperature…

4 years ago