The extent of the contract included new: Chiller Unit, Buffer Vessel, Variable speed pump set, associated controls and modification of main water pipe work runs.
The key aim for the project was to undertake the works as quickly as possible with minimal disruptions due to the site being fully operation and with no opportunity to shut down.
This was done by strategic planning of the strip out and removal phase, new plant installation phase and pre-fabricated pipe work to minimise install time.
The plant was up and running again within 48 hrs with the project being fully complete within 5 days.
Loblaws awarded MTX with the contract to update the ripening rooms at their Boucherville Quebec…
Winfresh UK required extra capacity at their Stanstead location, in order to cater for their…
Van-Whole produce awarded MTX the contract to demolish their existing ten (10) 20-pallet ripening rooms…
Installation of two, 3-tier random access tropical ripening rooms and a 3-tier blast chiller for…
Save On Foods constructed a distribution facility in Acheson, Alberta. The facility was built by…
MTX Contracts Ltd successfully completed the design, construction, engineering and commissioning of a new temperature…