Univeg Katope UK – New Plant Installation

The extent of the contract included new: Chiller Unit, Buffer Vessel, Variable speed pump set, associated controls and modification of main water pipe work runs.

The key aim for the project was to undertake the works as quickly as possible with minimal disruptions due to the site being fully operation and with no opportunity to shut down.

This was done by strategic planning of the strip out and removal phase, new plant installation phase and pre-fabricated pipe work to minimise install time.

The plant was up and running again within 48 hrs with the project being fully complete within 5 days.

MTX Ripening Technology

Recent Posts

Loblaws – 12 x 42 Pallet Banana Ripening Rooms

Loblaws awarded MTX with the contract to update the ripening rooms at their Boucherville Quebec…

6 years ago

Winfresh UK – Ripening Rooms

Winfresh UK required extra capacity at their Stanstead location, in order to cater for their…

6 years ago

Van-Whole Produce – Banana Ripening Rooms

Van-Whole produce awarded MTX the contract to demolish their existing ten (10) 20-pallet ripening rooms…

6 years ago

Turner’s PPL – Tropical Ripening Rooms

Installation of two, 3-tier random access tropical ripening rooms and a 3-tier blast chiller for…

6 years ago

Save On Foods – 5 x 42 Pallet Banana Ripening Rooms

Save On Foods constructed a distribution facility in Acheson, Alberta. The facility was built by…

6 years ago

Minor Weir and Willis Temperature Controlled Distribution Warehouse

MTX Contracts Ltd successfully completed the design, construction, engineering and commissioning of a new temperature…

6 years ago