This was an extension to the clients current facility that already houses thirty 24 tonne Ripening Rooms previously installed in addition to a two storey temperature controlled packing facility and large store.
The rooms were constructed using 100mm thick insulated PIR composite panel. Within each of the rooms we have a complex steelwork arrangement which acts as pallet support.
Full design and installation including mechanical, electrical and refrigeration was carried out in house. Cooling to the rooms was provided by a series of DX packaged condensing units provided by Airedale. A sophisticated control system was installed offering accurate temperature control.
The timely completion of the project was vitally important as this was key to the clients operational requirements.