Windward Isles Bananas Limited

MTX were contracted to supply, deliver and install the four pressurised ripening rooms after dismantling and removing existing internal facilities.

The ripening room is designed to expand Winward Isles current banana processing volume by providing flexible loading capabilities for the end 10 pallets of each room. The reversible air flow process ensures an even flow is directed through the fruit and therefore more consistently ripened fruit.

The current chilled water installation feeding the existing banana ripening rooms was expanded to allow for the new rooms.

The bespoke designs for this project are carried out in house, along with the complete project management of all construction aspects.

As with other recent MTX fruit ripening projects, a system of inverters will be used to enable variable control of the fans in the ceiling voids. This can significantly reduce client operating costs and reduce energy consumption.

MTX Ripening Technology

Recent Posts

Loblaws – 12 x 42 Pallet Banana Ripening Rooms

Loblaws awarded MTX with the contract to update the ripening rooms at their Boucherville Quebec…

6 years ago

Winfresh UK – Ripening Rooms

Winfresh UK required extra capacity at their Stanstead location, in order to cater for their…

6 years ago

Van-Whole Produce – Banana Ripening Rooms

Van-Whole produce awarded MTX the contract to demolish their existing ten (10) 20-pallet ripening rooms…

6 years ago

Turner’s PPL – Tropical Ripening Rooms

Installation of two, 3-tier random access tropical ripening rooms and a 3-tier blast chiller for…

6 years ago

Save On Foods – 5 x 42 Pallet Banana Ripening Rooms

Save On Foods constructed a distribution facility in Acheson, Alberta. The facility was built by…

6 years ago

Minor Weir and Willis Temperature Controlled Distribution Warehouse

MTX Contracts Ltd successfully completed the design, construction, engineering and commissioning of a new temperature…

6 years ago